Commercial priorities and the first product experiment

The catalog contains 41 software/business dossiers, all 372 family assessments and 719 inventoried manuscripts. The leading hypothesis remains one shared evidence and model-assurance platform. There are 37 runnable utilities, 21 documentary contracts and 21,853 passed checks in 58 saved reports. These are research and integration evidence; no buyer demand, profitable deployment or independent proof acceptance has been established.

Build first: an Optimization Assurance Workbench for facility-planning reviews by logistics/operations consultancies. This is the selected first experiment within the shared platform, not a validated market winner. A concrete generated case shows a solver FEASIBLE plan independently certified optimal by an exact dual witness. Source runtime remains unestablished, so use conventional proposal engines and useful independent checking. First product specification, revised dossier.

Build and earning queue

Priority Workflow and candidate buyer Concrete capability now Evidence needed before a commercial claim
1 Facility-planning assurance for logistics/operations consultancies Stable-ID CSV intake, strict model/plan checks, exact bounds, optional existing-solver proposals and HTML/JSON review exports Permissioned real study, useful recurring review gaps, willingness to pay and delivery cost
2 Aggregate-data law/constraint review for statistical engineering teams Exact tiny laws, fixed-event comparison, explicit bound conditioning; live SciPy agreement Valid actual experiment design, material errors caught and advantage over existing practice
3 Allocation certificates and flexibility review for operations teams Existing-solver matching witness checks, attaining cardinality bounds and tiny counts Real mandatory constraints, independently accepted certificates and actionable delivery value
4 Bounded-flow scenario/model review for planning teams Binary signed-bound reduction, tiny exact arc-vector diagnostics and checked existing-solver proposals Useful scenario law/units, practical large-support backend and planning decisions improved
5 Scientific/quantum numerical assurance for domain teams Exact geometry, correlation, spectral, aliasing and polynomial-bound controls Domain fidelity, numerical/program bridges and buyer budget
6 Sparse permutation framework research for data-access teams Shared-switch replay, decimal-wire provider, tiny-law and entropy checks Universal numerical threshold, compact storage, realistic sparse/batched workload and fair-bit/PRG distinction
7 Three-machine scheduling assurance for narrow unit-job workflows Direct witness checks, tiny optima/deadline evidence and live CP-SAT adapter Repeated value beyond existing solver output and accurate real-model correspondence
8 Exact selection/ambiguity assurance for integration teams Preserved item IDs, exact tiny counts, checked existing-solver proposals and explicit unknown negatives Useful decisions beyond incumbent matching/manual review; accurate business-rule mapping

These overlap within one platform; do not sum them as independent customers or forecast total revenue from the number of modules. Complete catalog, family directory.

What the new comparisons establish

The public fixed-margin event has exact probability 5/143 under intended conditional independence versus 3/7 under uniform feasible tables. It crosses a declared 1/20 threshold because the law changes. A fresh isolated SciPy 1.18.1 run now agrees across 284 margin pairs/494 observed tables and five fixture cases, with 586 controls. Existing statistical tools already provide the base law; potential value is a traceable law/constraint/event review, not replacing an erroneous RNG. Updated data dossier, public report.

The scheduling source supplies a complexity classification and bounded global-description proof with exponent 150020, not a practical speedup. The new tiny reference passes 3,346 controls and finds an exact three-slot schedule where one priority heuristic takes four. OR-Tools reaches the same independently checked optima on all eight generated cases. In one case its FEASIBLE proposal attains an elementary lower bound; in another, OPTIMAL status alone does not fill an exhausted independent reference. Keep the direct scheduler deferred and evaluate only a narrow assurance adapter. Scheduling dossier.

The subset-sum sources have separate two-sided faster-time and one-sided lower-space decision guarantees. Their known 64-bit main guards first pass at 600,000 and 36 billion items, while additional fixed cutoffs are unselected. Direct source backends are deferred. A generated repeated-value reference preserves exact binomial item multiplicity, but conventional CP-SAT already provides checked feasible selections on the same controls. Vendor matching/manual ambiguity review also exists. Evaluate a bounded identity/count/witness module only if it changes a recurring review decision. Revised selection dossier.

The literal-packaging source offers a constructed factor-two symbol bound. The prototype emits checked length-aware byte-view artifacts and measures complete indexed/compressed bytes. In the public 48-title sample, 28 raw bytes saved give no gzip reduction and grow XZ by 32 bytes. Synthetic periodic overlap saves bytes already through conventional greedy. Established compiler/linker pooling is a strong baseline, and an assumed AUD 4,000 for 20 hours assessment leaves only AUD 400 before other costs. Keep commercial confidence low and defer the full source backend until actual construction and useful workload evidence exist. Packaging dossier.

The numerical-range source claims the sharp complete constant two. The new exact reference separately supplies finite norm-threshold evidence and covered-domain polynomial uppers; 857 finite and 195 live-library controls passed. On a generated sharpness example, the conditional new bound fits 2.2 where the prior-bound calculation does not, but direct exact norm-two evidence already suffices and costs far fewer selected arithmetic charges. Enclosure reuse across many expensive polynomial error calculations is a potential workflow, unimplemented and untested here. Keep a bounded review module at low commercial confidence and defer a general library. Numerical dossier.

Facility planning adds 5,127 reference, 34 solver and four extra dual controls. Existing software matches the tiny optima; no source solver advantage is shown. The specific opportunity is a better review/report workflow, with unknown demand. Threshold PDF pages 1-5/27-35 and recovery pages 1-6 reveal fixed-accuracy constants, retained history expansion, surplus-removal overhead and a distinct anchor/proxy promise. Defer the direct backend. Comparison.

Direct backends still deferred

The literal general table sampler, accelerated matcher and perfect-matching FPRAS have extreme schedules or prerequisites. The switch-chain claim concerns a specified complete-host kernel and all steps; thin-tree/spectral constructions have unselected thresholds or expensive schedules. Uniform k-server activation can exceed a deployment horizon, and language-class derandomization does not preserve arbitrary random outputs. The current JSON permutation provider loses the measured storage comparison against a packed array, while the universal source sweep constant is unselected. Tiny finite references must not be relabeled as those unrestricted source backends. Feasibility evidence.

The positive-basis algebra audit remains a low-confidence specialist opportunity: an existing CAS supplies much of the underlying computation and no recurring buyer decision is shown. Identifiability/uniqueness theorems and asymptotic physics claims also require separate numerical, measurement, hardware and finite-instance bridges.

Price and delivery hypotheses

The shared review pilot uses an illustrative AUD 10,000 integration fee and AUD 180 per specialist hour. At 35 hours direct labor is AUD 6,300, leaving AUD 3,700 before sales, support and overhead; 56 hours already cost AUD 10,080. A scheduling module hypothesis is AUD 5,000 with 20 hours of direct labor, leaving AUD 1,400 before other costs; 30 hours exceed the fee. These are assumptions for testing, not quotes, revenue or profitable delivery evidence.

A numerical engineering-review hypothesis uses AUD 9,000 and 35 hours at AUD 180/hour, leaving AUD 2,700 before overhead; 55 hours cost AUD 9,900. This is unvalidated and overlaps the shared platform rather than adding another independent customer.

The ten-case expert packet is prepared and unperformed. Its eight scope-error cases and two synthetic documentary controls retain their archived thirteen-contract edition, separate from the current twenty-one-contract registry. Independently measure material gaps, false alarms, correction effort and preparation time; repeat-reading effects are not report benefit. A recurring subscription requires demonstrated repeated decision value and low support cost. Current pilot specification.

The first facility-review price experiment is AUD 5,000-10,000. At an illustrative AUD 7,500 and 25 hours at AUD 180/hour, labor is AUD 4,500 and the remainder AUD 3,000 before other costs; 45 hours cost AUD 8,100. These assumptions are unvalidated and overlap the shared platform. Subscription value requires repeated studies and bounded support.

Next business decision

The public baseline identifies weighted/rectangular cost and assignment requirements outside the first release. Prioritize a separately scoped ordinary-plan audit, then evaluate the review/export workflow against the consultancy's existing process on permissioned studies. Browser polish does not resolve those model gaps. Keep model errors, numerical/certificate evidence, source proof and commercial acceptance separate. No external outreach, purchase or paid compute occurred. Research is published to the authorized GitHub repository and Dokploy site; this is not a deployed customer optimization service.

Edit-distance source activation and existing exact tools

The selected source's large branch requires ell >= 2^1000. Its first necessary guard activates only at symbolic length 2^(2^(2^999))-1; full physical eligibility has additional accuracy and bit-width requirements. At N=10^12, ell=8. This makes the literal backend unsuitable for a practical first product. The source estimate is probabilistic on both sides and supplies no edit script.

A fresh isolated RapidFuzz 3.14.6 comparison adds 2,023 finite/library/guard controls. Exact routines already supply distances, cutoff predicates and alignments. On a generated 65,536-symbol shifted pair, unrestricted distance took about 101 ms median; a cutoff query took about 0.13 ms. These different output requirements and synthetic timings supply no source-backend speedup or customer benefit. A cutoff sentinel and normalization changes must be represented correctly. Detailed report, revised dossier.

Keep direct edit-distance commercialization deferred and conventional integration confidence low. The facility-planning review workflow remains the first product experiment; its buyer demand is still unvalidated.

Ordered-algebra formula testing

Family 116 adds an explicit characteristic-zero matrix construction and a bounded exact visible-tree implementation. A nonzero matrix entry disproves a free identity without the universal hitting theorem; a zero prefix is unknown and a full zero remains source-conditional. The source's black-box novelty and our visible-tree API are distinct. Positive-characteristic and inverse-formula generators have much larger dense/list costs and remain deferred.

726 controls pass across exact word expansion, matrix entries, existing SymPy, deliberately missed probes, target-algebra differences and resource limits. A source-derived short witness avoids full expansion on a generated sixteen-factor product, but conventional exact two-by-two probes find the same witness faster. Full source-dimension attempts hit rational-bit caps. No novel speed, accepted universal proof or paid demand is inferred. Dossier, comparison and schedules.

Retain a specialist SDK/CI integration experiment at low commercial confidence. The first product recommendation remains facility-planning assurance. An illustrative AUD 6,000/20-hour integration leaves AUD 2,400 at an assumed AUD 180/hour before other costs; 35 hours exceed the fee in labor alone. These are unvalidated assumptions.

Game algorithms and strategy-region evidence

Family 104 now has a four-variant matrix, bounded deterministic source reference and separate finite threshold-region checker. 1,097 controls pass across 368 generated games and boundary cases; every completed label agrees with the tiny exhaustive oracle. Some two-vertex recursions require hundreds of thousands of calls or exhaust two million charges. Mature production tools have not been benchmarked; no competitive advantage is shown.

The randomized huge-J wrapper is deferred when reached, but its Basic branch can bypass it. The stochastic binary discount denominator is not a required loop count; its backend remains unmeasured. Expected/almost-sure payoff, parity memory, value-optimality and initial credit require distinct contracts. Dossier, measurements.

Keep a specialist integration hypothesis at low confidence. An illustrative AUD 10,000/40-hour job leaves AUD 2,800 at AUD 180/hour before other costs; sixty hours exceeds the fee. These assumptions and demand remain unvalidated. Facility-planning assurance remains the first build.

First local facility-review release

The workbench now imports stable-ID CSVs, preserves exact decimals and raw bytes, rejects unsupported constraints, checks submitted and solver-proposed plans separately, verifies named-ID duals and emits fresh HTML/JSON reports. 104 new controls and eight generated examples pass. Cost 24 versus optimum 17 is a synthetic illustration; solver OPTIMAL can coexist with independent unknown, and a separate cost-12 dual example proves optimum without enumeration.

The mathematical source backend stays deferred. The tool accepts only the supported unweighted, uncapacitated strict metric, caps 48 locations and records resource limits. The site hosts generated reports; there is no customer upload endpoint or hosted optimizer. Browser intake, actual studies, measurable review benefit and paid demand remain open. Keep the existing price experiment explicitly unvalidated.

Evidence-package review and first-product fit

The family-266 review separates native exactly-three MUB evidence, an exact Fourier certificate and formal at-most-five/cancellation statements. Eleven named native package paths are absent from the pinned paper directory. Available exact Gram data pass 35 source-data/arithmetic controls, including exact factorization of six matrices and 98 positive pivots per order. The full moment expansion, native pipeline and Lean kernel were not run. Missing local artifacts are a reproduction gap, not a mathematical refutation. Existing execution/package tools constrain commercial differentiation.

The public planning workflow review reveals weighted, rectangular, required-site and capacity-assignment needs outside the initial facility checker. Prioritize a separate ordinary-plan audit before browser polish. Keep source metric eligibility distinct. The public baseline is synthetic and documented, not a customer dataset or a runtime benchmark. Demand and price hypotheses remain unvalidated.